PRACTISE CMS
Not sure which resin you ne for your project? Take a look at the quick guide below. If you are still unsure please give us a call or use the website live chat, we will be happy to help.
Product | Designed for | Max. depth | Mix ratio | Working time | Touch dry | Full cure | Viscosity |
---|---|---|---|---|---|---|---|
Clear Coats |
Up to 5mm | 1:1 |
15 - 20 minutes @ 23°C | 4 - 5 hours @ 23°C (greater than 500g mix) | 5 - 7 days | Medium viscosity | |
Clear Coats |
Up to 5mm coating/Up to 20mm casting (max 3 kgs in one pour) | 1:1 | 10 - 15 minutes @ 23°C | 3 - 4 hours @ 23°C (greater than 500g mix) | 5 - 7 days | Medium viscosity | |
Coasters |
Up to 25mm | 2:1 | 90 minutes @ 20°C | 24 hours @ 20°C (greater than 500g mix) | 14 - 21 days | Medium viscosity | |
Deep Casting |
Up to 12 litres or up to 50mm deep in one pour | 2:1 | 10 hours @ 23°C | Can be de-moulded in 3 - 4 days @ 22°C (greater than 1kg mix) |
21 days | Low viscosity | |
Deep Casting |
Up to 15kg or up to 85mm deep in one pour | 2:1 | 12 hours at 18°C (2kg mixed mass) | Can be de-moulded in 5-7 days at 22°C depending on volume cast. |
14 days | Low viscosity | |
Clear Coats | Up to 7mm | 2:1 by weight 2.5:1 by volume |
40 minutes @ 23°C |
6-7 hours @ 23°C (greater than 500g mix) | 7 days | Medium viscosity | |
Blob Art |
---- | 1:1 |
15-20 minutes @ 23°C (250g mixed mass) |
2-3 hours @ 23°C | 4-5 days | High viscosity | |
Encapsulation Potting |
---- | Varies | 15 - 20 minutes @ 20°C at 2% catalyst | 30 - 40 minutes @ 20°C | Dependant on % of catalyst | Medium viscosity |